Click here to go back to the main navigation page.

 

After I ripped down the cedar.

Kitchen pre-prep of cabinets.

Pile of cedar ready for chiminea

Kitchen cabinets with one coat of primer

Alcove with first mud.

Wood flooring delivery

They were 2 pails shy of adhesive.  Should be 5.

Final skim done.  More sanding is needed.

Second coat of primer is on.

Amazing what a little paint and hardware will do.